Name of
the sponsoring Agency |
Project title |
Amount sanctioned |
Period |
Status |
1 |
Department of Science
and Technology, New Delhi under the Fast Track proposal for Young Scientist, |
Development of Nonlinear Data Driven Models for flood
forecasting for Indian Rivers |
5.02 lakh |
2006-2009 |
Completed |
2 |
Sponsored by Irrigation and Command Area Development (I&
CAD), Government of Andhra Pradesh |
Dam Break Flow
Simulation Study of Sriramsagar Dam |
4.5 lakhs |
2003-2004 |
Completed |
3 |
Sponsored by
Irrigation and Command Area Development (I& CAD), Government of Andhra
Pradesh |
Dam Break Flow
Simulation Study of Lower Manner Dam |
4.5 lakhs |
2003-2004 |
Completed |
4 |
Under Hydrology Project II, Funded by
World Bank |
Hydrological analysis
of ungauged catchments |
67.0 Lakhs |
2008-2014 |
Completed |
5 |
Under Hydrology
Project II, Funded by World Bank |
Storm water
management in Cooum sub-basin |
90.0 Lakhs |
2008-2014 |
Completed |
6 |
GMR Coastal Energy
Pvt., Ltd., Bangalore |
Area drainage and hydro-geological study for 6300 MW coal
based thermal power plant at Ontimamidi village
near Kakinada, East Godavari dist., Andhra Pradesh) |
11.13 Lakhs |
2010-2011 |
Completed |
7 |
GMR Kakinada Energy
Pvt. Limited, Bangalore |
Area drainage & hydro-geological studies for Proposed 5 x
400 MW gas based combined cycle power plant at Kakinada, Andhra Pradesh |
7.61 Lakhs |
2010-2011 |
Completed |
8 |
APGENCO, Hyderabad |
Hydro–Geological
studies for the proposed Vadarevu Thermal Power
Project of 4000 MW (5 X 800MW) near Kanuparthi
Village, Naguluppalapadu Mandal,
Prakasam Dist., A.P, |
18.57 Lakhs |
2011-2012 |
Completed |
9 |
APGENCO, Hyderabad |
Hydro Geological studies, for the proposed Kothagudem Thermal, Power Station (KTPS) Stage – VII (1 x
800 MW), Paloncha, Khamman
Dist., Andhra Pradesh |
23.93 Lakhs |
2012-14 |
Ongoing |
10 |
APGENCO, Hyderabad |
Hydro Geological studies, for the proposed Dr. Narla, Tata Rao Thermal Power
Station Stage-V (1 x 800 MW), Ibrahimpatnam,
Krishna Dist., Andhra Pradesh |
23.93 Lakhs |
2012-14 |
Ongoing |
11 |
CE, Polavaram Project, I. &CAD |
Dam break study of
Polavaram Project, Andhra Pradesh |
14.51 Lakhs |
2012-2013 |
Completed |
12 |
CE, Nagarjuna Sagar Project, I. &CAD |
Preparation of emergency action plan for ASRSSP and
inundation maps associated with dam break analysis in Andhra Pradesh |
10.6 Lakhs |
2012-2013 |
Completed |
13 |
APPDCL, Hyderabad |
Hydro geological study for 800 MW expansion unit
under stage II for Sri Damadaram Sanjeevaiah Thermal power station (SDSTPS), Nelature Village, Muthukur Mandal, Nellore District Andhra Pradesh |
28.37 Lakhs |
2013-2014 |
Completed |
14 |
Karnataka
Power Corporation Ltd., Bangalore |
Dam
break analysis of Sharavathi and Varahi basin dams |
21.50 Lakhs |
2013-2014 |
Ongoing |
15 |
M/S.
Kakinada SEZ Pvt. Ltd., Hyderabad |
Drainage
Analysis and Design for Proposed Kakinada SEZ (KSEZ) Area in Andhra Pradesh |
21.40 Lakhs |
2013-2014 |
Completed |
16 |
CE,
Srisailam Project |
Preparation
of emergency action plan (EAP) for Neelam Sanjeeva Reddy Sagar Srisailam project (NSRSSP) and
inundation maps associated with dam break analysis in |
29.45 Laks |
2014-2015 |
Ongoing |